WARRIOR 2400 SCREENING RIVER BED MATERIAL



Application Summary

At this site in Muscat, Oman, on the Al Batinah road, a Powerscreen Warrior 2400 was screening river bed material. This plant was working on a road project, where the aim was to produce sub-base from wadi feed material (river bed.) The machine offers a low operating cost per ton and mainly produces -63mm material for sub base.

Setup

Warrior 2400

Top deck punch plates with 150mm aperture
Bottom deck mesh with 63mm aperture
Bulk density of feed material is 1.8 tonnes per metre
Operating for an average of 20 hours per day
Warrior screening river bed material


Feed material

River bed screening material


Stockpile material

stockpiled material from river bed screening